Skip navigation

More detiails of the route of the 2010 Amgen Tour of California are becoming available. The official route announcement is scheduled to begin on February 9th wit the information on several stages to be made public each day over the following four days.

 

It appears that the route for Stage 3, San Francisco to Santa Cruz, will take in four significant climbs. The first will be Tunitas Creek which will be followed by a sharp descent down King's Mountain Road into Silicon Valley. After only about a mile in the valley, it will head back up Highway 84, a 3-mile, 1000 ascent to the town of Skylonda which is at the junction of Highway 84 and Highway 35(Skyline Boulevard). The route will continue down Highway 84, but unlike last year, it will turn onto Pescadereo Road just past the town of La Honda and ascend Haskins HIll a 2-mile 600-foot climb.

 

The stage will continue on Pescadero Road out to Highway 1. From there the route will be the same as last year including the final climb of Bonny Doon Road.

 

The all important stage 7 time trial will be held in downtown Los Angeles, starting and ending at AEG's(the owner of the AToC) Staples Center, home of the Los Angeles Lakers and Kings. The course is 21 miles in length and shaped like a barbell, two loop on either end of a straight section connnecting them. Beside visiting the Los Angeles Civic Center, it will also visit the USC campus and the LA Ciliseum. The course has a lot of ups and down including the notoriously steep Figuero Road.

 

Stage 8 will be held in the Santa Monica Mountains in and around the Thousand Oaks area which is the headquarters for the race's sponsor Amgen. The meat of the stage will be four laps of a 21-mile loop which includes the popular local climb called Rock Store a 2-mile ascent averaging 7%. The loop also contains a long section on Mullholand Highway and a screaming, technical descent down Westlake Boulevard back to Thousand Oaks. Agoura Road will take the riders back to the start of the climbing on the loop. There will be 7000 feet of total climbing on this stage which could be decisive given the sharp climbs, the narow roads and the technical dscending (down grades up to 15%).

 

One interesting note is the that on-course TV work will be performed by the same French crew which brings you those stunning pictures during the Tour de France. The race organizers have a partnership with the Tour de France organiers, ASO, which undoubtedly is one reason the entire French TV motorcycle crew will be coming to California to help broadcast the race.

 

Bruce

2,128 Views 3 Comments Permalink Tags: tour_de_france, bruce_hildenbrand, aeg, aso, amgen_tour_of_california